Moving critical IT infrastructure is not as simple as taking equipment from one location and installing it somewhere else.
For businesses planning SGX relocations to Keppel DC, there are several things that need to be considered before the first server is disconnected. Equipment, rack space, power, connectivity, cabling, installation, testing, and the actual move window all need to fit together.
Keppel DC Singapore 7 and 8 are located at 82 Genting Lane, Singapore, and the campus has become an important part of Singapore’s data centre infrastructure.
So, what should businesses plan before making the move?
Start With the Move Window
The first thing to establish is the target relocation date and the amount of downtime, if any, that can be accepted.
For trading and other business-critical environments, timing matters. A move that takes longer than expected can affect connectivity and day-to-day operations.
Before the move, create a clear schedule covering:
- De-racking and equipment preparation
- Transportation
- Rack installation
- Cabling and connectivity
- Power-up
- Testing and commissioning
- Final checks before going live
Having these steps documented makes it much easier for everyone involved to understand what happens and when.
Know Exactly What Is Moving
A detailed equipment list can save a lot of trouble later.
Start by identifying every server, switch, time server, FPGA system, network component, optic, DAC cable, and other equipment that needs to be moved or replaced.
This is also a good opportunity to ask a simple question: Does everything need to be relocated, or is this the right time to refresh some hardware?
For example, ageing servers, switches, optics, or cabling may be better replaced during the move rather than transported and installed again.
Plan the Rack, Power and Connectivity Before Arrival
One of the easiest mistakes during relocation is waiting until the equipment reaches the new site before figuring out where everything goes.
Rack allocation, power requirements, PDU requirements, cable paths, and connectivity should be planned beforehand.
For a high-performance environment, the physical arrangement matters too. Network connections should be properly mapped, cables labelled, and equipment positioned so that installation and future maintenance remain manageable.
This is where professional IT infrastructure services can make the planning process much smoother.
Don’t Treat Cabling as an Afterthought
Cabling can quickly become one of the most time-consuming parts of a data centre move.
Before the relocation, identify the required structured cabling, optics, DACs and network connections. Prepare a port and cable map so the installation team knows exactly what needs to connect where.
For trading environments where network performance and latency matter, the details become even more important. A carefully planned low-latency infrastructure can help avoid unnecessary issues after the move.
Read More: SP Sysnet Introduces High-Performance Networking with Arista Low Latency Switches
What Happens on Moving Day?
A successful relocation depends heavily on execution.
The team may need to de-rack equipment, pack and transport it safely, re-rack everything at the new site, complete the cabling, connect power and network links, and then carry out commissioning and connectivity tests.
The process should not stop once the equipment powers on.
Every important connection should be checked. Servers and network devices should be verified, time synchronisation should be confirmed, and any application or connectivity dependencies should be tested before the environment is considered ready.
Should You Plan Support After the Move?
Yes. It is easy to focus so much on the physical relocation that post-move support gets overlooked.
Having access to spares, troubleshooting assistance and technical support after the move can be valuable if something does not work as expected.
SP Sysnet supports businesses with infrastructure supply, professional services and relocation-related requirements, helping customers manage the different pieces of a move rather than treating hardware delivery and installation as separate tasks.
A Better Way to Approach SGX Relocation Planning
The best relocation is the one that feels uneventful.
That usually comes from doing the detailed work early: confirming the move window, documenting equipment, checking rack and power requirements, planning cabling, preparing replacement hardware, and defining the testing process.
SP Sysnet can support the planning and execution of infrastructure moves, from servers, switches and connectivity components to installation, commissioning and post-move support.
If your team is preparing for SGX relocations to Keppel DC, starting the planning early can make the actual move considerably easier.
Frequently Asked Questions
What should be included in relocation planning?
Relocation planning should cover the move schedule, equipment inventory, rack and power requirements, cabling, transportation, installation, connectivity testing, commissioning and post-move support.
Where is Keppel DC Singapore 7 and 8 located?
Keppel DC Singapore 7 and 8 are located at 82 Genting Lane, Singapore 349567. Both facilities form part of the Keppel data centre campus at Genting Lane.
What equipment may need to be planned for an SGX infrastructure move?
Depending on the environment, this can include servers, L3 switches, time servers, FPGA products, optics, DAC cables, racks, PDUs, KVM equipment and structured cabling.
Should hardware upgrades be considered during a relocation?
Yes. A relocation can be a practical opportunity to replace ageing servers, switches or other infrastructure instead of moving equipment that is already approaching the end of its useful life.
Why is testing important after a data centre move?
Testing confirms that power, networking, cabling, connectivity, time synchronisation and critical equipment are working correctly before the environment is put fully into operation.